BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//Suwanu - ECPv5.7.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:Suwanu
X-ORIGINAL-URL:https://suwanu-europe.eu
X-WR-CALDESC:Events for Suwanu
BEGIN:VTIMEZONE
TZID:Europe/Madrid
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0100
TZNAME:CET
DTSTART:20500101T000000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20500604
DTEND;VALUE=DATE:20500605
DTSTAMP:20260920T232355
CREATED:20191126T140709Z
LAST-MODIFIED:20191126T142008Z
UID:8630-2537913600-2537999999@suwanu-europe.eu
SUMMARY:Reclaimed water for orange orchards in Sagunto (Valencia\, Spain)
DESCRIPTION:Reclaimed water for orange orchards in Sagunto (Valencia\, Spain)\n\n		\n	\n\n	\n		\n			Sagunto waste water treatment plant\n\n		\n	\n\n	\n		\n			 \nWaste water source\nThe water originates from the Sagunto wastewater treatment plant. \n\n		\n	\n\n	\n		\n			 \nDistribution System\nThere are pressurized pipes from the WWTP to the filter plant and water is pumped into a water reservoir (of a volume of 10\,000 m3) before it enters the Irrigators communities network. After this water (reclaimed) is into the system\, it is mixed with other water sources and kept in 2 water reservoirs. \n\n		\n	\n\n	\n		\n			 \nFarming system\nOrchards with orange trees. \n\n		\n	\n\n	\n		\n			 \nWaste water treatment description\nNutrient removal : Decantation and prolonged aeration\nPesticide removal : none\nDisinfection : none\nSuspended solids removal : Physical sieves and a degreaser\nOther : The wastewater treatment plant involves a primary and secondary treatment as described below. No tertiary treatment or disinfection is provided. \n\n		\n	\n\n	\n		\n			 \nCapacity\nEach day 4\,461 m³ of municipal wastewater is treated\, which correlates to 8\,573 population equivalents. \n\n		\n	\n\n	\n		\n			 \nExtent of the agricultural beneficiaries\nThe reclaimed water is used for the irrigation of 2\,800 hectares\, divided over 3\,070 farmers. \n\n		\n	\n\n	\n		\n			 \nCosts\nThe total implementation cost was 18 million euros. No information about the cost of the water was provided. \n\n		\n	\n\n	\n		\n			 \nType of agreement\nThere is an agreement with the Regional Government of Valencia and with the River basin Authority of Jucar river for the use of reclaimed water. \n\n		\n	\n\n	\n		\n			 \nScientific results\n\n		\n	\n\n	\n		\n			 \nAdditional information
URL:https://suwanu-europe.eu/project/template-copy-13-copy-copy-4/
LOCATION:Spain
CATEGORIES:Initiative
ATTACH;FMTTYPE=image/jpeg:https://suwanu-europe.eu/wp-content/uploads/2019/11/sagunta.jpg
GEO:39.692852;-0.231636
END:VEVENT
END:VCALENDAR